Method

How status is assessed

Four sources of evidence, combined per facility.

Grid distance

Within 2 km of a distribution line

1,487 kmlines mapped

Night light

Facility brighter than surroundings

22months · NASA

Reported power

Solar or generator on OpenStreetMap

26facilities

Town service

Documented mini-grid or utility in town

11facilities

Status

Electrified

186

Grid within 2 km with persistent night light, on the LEC grid in Greater Monrovia, a utility record, or reported solar / generator.

Likely electrified

58

Partial evidence: grid nearby with weak light, light without mapped grid, or town service.

No evidence of power

230

No grid within 2 km and no persistent night light.

Needs verification

74

Location conflict or missing coordinates.

Rural · Urban

379 rural159 urban

Urban: Greater Monrovia, or within 4 km of a county capital or Ganta.

Limits

  • Proximity is not a confirmed connection
  • Grid maps are partial (little data for Lofa and the south-east)
  • Night light shows the neighbourhood, not the building; in Monrovia the LEC grid is used instead
  • Field checks are needed before investment decisions

Solar for rural facilities without power

$2,803,400 · 223 facilities

Small clinic

117

Under 3,000 people

Lights · vaccine fridge · fans · lab · staff housing

Solar
3.54–5.31 kWp
Battery
5.12 kWh
Inverter
5 kW
Demand
5.3 kWh/day
Cost each
$9,200–$11,170

Clinic

84

3,000–8,000 people

Lights · vaccine fridge · fans · lab · water pump · staff housing

Solar
4.13–4.72 kWp
Battery
10.24 kWh
Inverter
5 kW
Demand
7.8 kWh/day
Cost each
$11,960–$13,050

Health centre

18

Health centres, or 8,000+ people

Lights · cold chain · fans · lab · oxygen · water pump

Solar
8.26–10.03 kWp
Battery
15.36 kWh
Inverter
8 kW
Demand
15.1 kWh/day
Cost each
$19,600–$23,080

Hospital

4

Hospitals

Lights · cold chain · lab · oxygen · sterilisation · water

Solar
21.24–25.96 kWp
Battery
35.84 kWh
Inverter
18–22 kW
Demand
38.3 kWh/day
Cost each
$43,280–$52,700

Solar + LiFePO4 battery, no diesel, sized in Phasor for ≤1% unserved energy over an hourly year, minimum 2 kWp. Class follows the facility level and the people living within 5 km (WorldPop 2025, nearest facility); solar size and logistics follow the climate zone. Power system only, equipment assumed in place. Planning estimate ±25%.

Assessment 2026-11-13 · Power lines shown as 300 m density cells, not exact routes

Also ~233 km of energised corridors in Nimba, Grand Gedeh, River Gee and Maryland, traced approximately from the RREA/NRECA NGEAP map (2020). Facilities within 2 km count as likely electrified, or electrified with persistent night light.