Method
How status is assessed
Four sources of evidence, combined per facility.
Grid distance
Within 2 km of a distribution line
Night light
Facility brighter than surroundings
Reported power
Solar or generator on OpenStreetMap
Town service
Documented mini-grid or utility in town
Status
Electrified
186Grid within 2 km with persistent night light, on the LEC grid in Greater Monrovia, a utility record, or reported solar / generator.
Likely electrified
58Partial evidence: grid nearby with weak light, light without mapped grid, or town service.
No evidence of power
230No grid within 2 km and no persistent night light.
Needs verification
74Location conflict or missing coordinates.
Rural · Urban
Urban: Greater Monrovia, or within 4 km of a county capital or Ganta.
Limits
- Proximity is not a confirmed connection
- Grid maps are partial (little data for Lofa and the south-east)
- Night light shows the neighbourhood, not the building; in Monrovia the LEC grid is used instead
- Field checks are needed before investment decisions
Solar for rural facilities without power
$2,803,400 · 223 facilitiesSmall clinic
117Under 3,000 people
Lights · vaccine fridge · fans · lab · staff housing
- Solar
- 3.54–5.31 kWp
- Battery
- 5.12 kWh
- Inverter
- 5 kW
- Demand
- 5.3 kWh/day
- Cost each
- $9,200–$11,170
Clinic
843,000–8,000 people
Lights · vaccine fridge · fans · lab · water pump · staff housing
- Solar
- 4.13–4.72 kWp
- Battery
- 10.24 kWh
- Inverter
- 5 kW
- Demand
- 7.8 kWh/day
- Cost each
- $11,960–$13,050
Health centre
18Health centres, or 8,000+ people
Lights · cold chain · fans · lab · oxygen · water pump
- Solar
- 8.26–10.03 kWp
- Battery
- 15.36 kWh
- Inverter
- 8 kW
- Demand
- 15.1 kWh/day
- Cost each
- $19,600–$23,080
Hospital
4Hospitals
Lights · cold chain · lab · oxygen · sterilisation · water
- Solar
- 21.24–25.96 kWp
- Battery
- 35.84 kWh
- Inverter
- 18–22 kW
- Demand
- 38.3 kWh/day
- Cost each
- $43,280–$52,700
Solar + LiFePO4 battery, no diesel, sized in Phasor for ≤1% unserved energy over an hourly year, minimum 2 kWp. Class follows the facility level and the people living within 5 km (WorldPop 2025, nearest facility); solar size and logistics follow the climate zone. Power system only, equipment assumed in place. Planning estimate ±25%.
Assessment 2026-11-13 · Power lines shown as 300 m density cells, not exact routes
Also ~233 km of energised corridors in Nimba, Grand Gedeh, River Gee and Maryland, traced approximately from the RREA/NRECA NGEAP map (2020). Facilities within 2 km count as likely electrified, or electrified with persistent night light.